Washington State University · Global Health – KenyaRADAR Documentation
INV-110654 · Draft v0.1 · 29 October 2026
Doc 00·Orientation

Start Here: RADAR Documentation Map

How the document set is organised, how the documents depend on each other, and which ones to read first for your role.

For: Leadership & funderEngineeringEOC & surveillanceM&E / researchGovernance & legalStatus: Draft v0.1Updated: 29 October 2026

In short

  • The RADAR project is broken into 18 focused documents, each covering one area, workflow or decision.
  • They are grouped into five tracks: Orientation, Product & Architecture, Operations, Trust & Safety, Delivery, plus a glossary.
  • Every document opens with a plain-language summary and a “How this document connects” panel showing what it depends on and what it feeds.
  • Pick the reading path for your role below, or follow the map.

Why it matters

RADAR touches surveillance officers, engineers, lawyers, evaluators and funders. One long document would bury each group's questions inside everyone else's. Separate, linked documents let each reader go straight to what they own — while the links make sure no one designs a piece in isolation.

Grant start is 1 November 2026; these documents are the working baseline for kick-off.

1The document map

Read the map from top to bottom. The problem and landscape decide what the shared event record must hold; the build documents turn that record into a working system; operations put it into EOCs; trust-and-safety documents set limits on everything above; and the delivery documents turn the evidence into gate decisions.

ORIENT BUILD RUN GOVERN DELIVER 01 Project Overview — open document01 Project Overview 02 Surveillance Landscape — open document02 Surveillance Landscape 18 Glossary & References — open document18 Glossary &References 03 Minimum Event Record — open document03 MinimumEvent Record 04 System Architecture — open document04 SystemArchitecture 05 Interoperability — open document05Interoperability 06 Intelligence Layer — open document06 IntelligenceLayer 07 DMT-PHE & AI Agent — open document07 DMT-PHE &AI Agent sources shape the record 08 Signal-to-Response Workflow — open document08 Signal-to-Response Workflow 09 Deployment & Adoption — open document09 Deployment & Adoption recommendations taught at 10 Data Governance — open document10 Data Governance 11 Security & Infrastructure — open document11 Security &Infrastructure 12 Responsible AI — open document12 Responsible AI constrain build & run ↑ 14 MEL Framework — open document14 MEL Framework 15 Partners & Governance — open document15 Partners &Governance 16 Budget & Resources — open document16 Budget &Resources 17 Risk Register — open document17 Risk Register 13 Roadmap & Stage Gates — open document13 Roadmap & Stage Gatesgo / no-go and payment evidence · people · money · risk
The document set at a glance. Read top to bottom: the problem and landscape shape the data contract (MER); the build documents turn it into a working system; operations put it into EOCs; trust-and-safety documents constrain everything above; delivery documents turn the evidence into gate decisions. Click any box to open that document.

2Documents by track

3Reading paths by role

You do not need to read everything. Start with the path for your role; the numbered boxes link straight to each document, in order.

Leadership & funder

The why, the plan, the money and the risks.

Project Overview → Roadmap & Stage Gates → Partners & Governance → Budget & Resources → Risk Register

Engineering team

Build order: data contract first, then architecture and integration.

Surveillance Landscape → Minimum Event Record → System Architecture → Interoperability → Intelligence Layer → DMT-PHE & AI Agent → Security & Infrastructure → Responsible AI

EOC & surveillance officers

What changes in your daily work and how you are supported.

Project Overview → Signal-to-Response Workflow → DMT-PHE & AI Agent → Deployment & Adoption

M&E and researchers

What is measured, how, and what each gate needs.

MEL Framework → Minimum Event Record → Responsible AI → Roadmap & Stage Gates

Governance & legal

Approvals, agreements, data classes and controls.

Data Governance → Security & Infrastructure → Surveillance Landscape → Responsible AI

4How the documents depend on each other

Each document lists the documents it builds on and the ones it informs. When you change one, check the “Informs” column: those documents may need updating too.

5How to read and maintain these documents

Labels you will see

LabelMeaningHow to treat it
ProposalStated in the funded proposal (INV-110654), the stage-gate paper or the project deck.Committed scope. Change only through the consortium and foundation.
ResearchExternal evidence — laws, standards, published studies, vendor specifications.Check the cited source for the latest version before relying on it.
RecommendedA design choice proposed in these documents.A starting point for the technical working group to confirm or replace.
OpenA decision that has not yet been made.Needs an owner and a date. Each document ends with its open questions.

Keeping the set healthy

  • One owner per document. Suggested owners are listed in 15 · Partners & Governance.
  • Change the source, then the dependants. If the MER fields change (doc 03), revisit 04, 05, 06, 08 and 14.
  • Version and date every change. The header of each document shows its status and last update.
  • Close open questions in writing. When a Open item is decided, record the decision, the date and who made it, and change the label.
Inconsistencies found across the source documents

While breaking the project down, a few differences between the proposal, the stage-gate paper and the deck came to light — for example five vs. four county EOCs in Phase 2, a 0.85 vs. 0.88 concordance threshold at Gate 2, and budget line items that add up to more than the total. Each is flagged where it matters (mainly in documents 13 and 16) and should be settled at kick-off.

6Source documents

Everything here is derived from the three source documents in the project's _docs folder, plus external research cited in each document.