Monitoring, Evaluation & Learning
Learning questions, exact metric definitions, where each number comes from, and the baseline-to-endline evaluation design.
In short
- Four learning questions: Is it faster? Is it more accurate and usable? Do multiple streams add intelligence? Does the GHEC-AI hand-off work?
- Every indicator has one exact definition, one data source and one owner — most come straight from RADAR's own timestamps and logs.
- Design: baseline before deployment, routine monitoring, endline near the end; mixed methods; internally led by WSU with KNPHI.
- Evidence feeds three decisions: gate go/no-go, model recalibration, and scale-up policy.
Why it matters
The gates are judged on numbers. If “concordance” or “detection-to-classification time” are defined loosely, two people can compute different answers from the same data — and a gate can be missed on a technicality or passed without real improvement. Precise definitions agreed now also protect the credibility of the two planned publications.
How this document connects
1Learning questions
| # | Question Proposal | Main evidence |
|---|---|---|
| LQ1 | Does RADAR reduce time from signal detection to DMT-PHE classification and escalation? | MER timestamps, baseline vs. post-deployment |
| LQ2 | Does it improve concordance with expert classification, documentation completeness, 7-1-7 performance and user acceptability? | Parallel runs, expert panel, decision logs, SUS |
| LQ3 | Does integrating multiple streams give earlier or additional actionable intelligence, and what technical, workflow or safety challenges affect adoption and scale-up? | Signal cards (which stream first), back-testing, interviews |
| LQ4 | Does the RADAR/DMT-PHE–GHEC-AI hand-off work — reliability, completeness, timeliness, user experience, effect on mobilisation? | Interface logs, response timestamps, interviews |
2From evidence to decisions
3Indicator reference sheet
Definitions are proposals for the MEL protocol Recommended; targets are from the stage gates Proposal.
| Indicator | Definition | Source | Target |
|---|---|---|---|
| Signal → classification time | Median (and IQR) hours from detected_at to first human-confirmed classified_at, for verified events | MER | ≤ 48 h (Gate 2) |
| Detection → escalation latency | Median hours from detected_at to first escalated_at at Level ≥ 2 | MER | Reduction vs. baseline |
| 7-1-7 compliance | % of events meeting each target separately (detect ≤ 7 d, notify ≤ 1 d, respond ≤ 7 d) and all three together | MER, Early Action Reviews | Improvement vs. baseline (Gates 2–3) |
| AI–expert concordance | % of assessed events where AI-supported level = panel reference level; plus weighted kappa | Parallel runs, panel | 0.85 / 0.88 / 0.90 |
| False-negative rate | % of panel Level 2–3 events classified lower by the AI-supported path | Parallel runs, panel | Below ceiling (set at Gate 1) |
| Documentation completeness | % of required DMT-PHE fields completed across escalation events (required set fixed in the protocol) | Decision log | 80% / 85% / 90% |
| Adverse decision events | Count of reviewed incidents meeting the agreed definition (doc 12) | Incident log | Zero |
| System Usability Scale | Standard 10-item SUS, 0–100, per site | User survey | 75 / 78 / 80 |
| Dataset integration | % of baseline-inventory datasets at integration Level ≥ 2 with monitored automated flows | Connector registry | ≥ 80% (Gate 2) |
| Additive intelligence | % of verified events where a non-human stream (animal, climate, OSINT) signalled first, and median lead time | MER links, signal cards | Reported (LQ3) |
| Hand-off performance | % of authorised responses with a complete hand-off; median time authorisation → team mobilised | Interface logs, MER | Reported (LQ4) |
4Evaluation design
- Baseline (before deployment). At the national EOC, reconstruct detection-to-classification, detection-to-escalation and 7-1-7 for recent events from existing records — a Gate 1 milestone that cannot be redone later. Proposal Repeat at each county before its go-live. Recommended
- Routine monitoring. Indicators computed automatically from MER and logs; monthly dashboard; quarterly review.
- Parallel runs. Eight weeks per site generating concordance datasets (doc 09).
- Endline. Toward the end of the grant: the same measures, plus surveys, key-informant interviews and workflow observation. Proposal
- Analysis. Pre/post comparison per site; where enough events exist, an interrupted time-series design; qualitative analysis of adoption barriers.
The formal evaluation is internally led by WSU with KNPHI rather than by an independent third party. Proposal To strengthen credibility: pre-register the protocol and analysis plan, keep the expert panel independent of the build team, have KEMRI lead data-quality assessment, and invite an external reviewer to audit the endline analysis. Recommended
Level 2–3 events are uncommon. At some sites there may be too few real events in a period for stable estimates. Report confidence intervals, pool across sites where appropriate, and supplement with simulation cases — clearly labelled as such.
5Data collection and ethics
- System-generated data (timestamps, logs) under KNPHI data-custodian approval.
- Surveys, interviews and observation with informed consent or an approved waiver through the KEMRI ethics process. Proposal
- Casual research assistants (budgeted in periods 1 and 3) support data collection and quality checks.
6Reporting and dissemination
| Output | Audience | When |
|---|---|---|
| Monthly indicator dashboard | Steering committee, EOC managers | Monthly from MVP |
| Gate evidence packs | Gates Foundation | Progress reports 1–2, final report |
| Annual partners meeting | KNPHI, counties, partners | Yearly (budgeted) |
| Two peer-reviewed manuscripts + preprints | Scientific community | By Gate 3 |
| Scale-up evidence report and policy brief | MoH, KNPHI, counties, funders | By Gate 3 |
| Regional dissemination | Africa CDC networks, WHO Preparedness Data Exchange | Year 3 |
7Open questions
- Which past events form the baseline, and over what period? Owner: MEL consultant + KNPHI · month 2
- Required DMT-PHE fields for the completeness measure. Owner: KNPHI + CGP
- Will an external reviewer audit the endline? Owner: PI
Sources
- INV-110654 proposal — Measurement and Evaluation; formal evaluation; outcome measures.
- Stage-gate paper — thresholds and Gate 3 milestones 1, 4–6.
- 7-1-7 Alliance — FAQ.
- MeasuringU — Interpreting SUS scores.