Doc 17·Delivery & Management
Risk Register
The main delivery, technical, data, AI and sustainability risks, how likely and serious each is, and how each will be reduced.
In short
- Fifteen risks across delivery, data, technology, AI, adoption and sustainability, each with a likelihood, impact, mitigation and owner.
- The highest-rated: slow data-sharing agreements (R1), weak source data or APIs (R2), low adoption (R3), procurement delays (R6), county power and connectivity (R8), staff turnover (R9) and no recurrent budget (R10).
- Risks are reviewed at every steering committee and at each gate.
Why it matters
Most risks that would sink RADAR are not technical — they are agreements, people, procurement and money. Naming them early, with an owner and an early-warning sign, turns surprises at a gate review into issues handled months earlier.
How this document connects
1Risk map
2Register
Ratings are before mitigation (L = likelihood, I = impact; L/M/H). Initial assessment Recommended — the steering committee owns the ratings.
| ID | Risk | L | I | Mitigation | Early warning | Owner |
|---|---|---|---|---|---|---|
| R1 | Data-sharing agreements and approvals take longer than planned, delaying live data and the MVP | H | H | Start month 1; standard DSA template; KNPHI-led umbrella agreement; DPIA lodged early; MVP can demo on de-identified replays while agreements finish | No signed DSA for an MVP source by month 3 | KNPHI + WSU |
| R2 | Source data incomplete, late, or without usable API | H | M | Integration ladder (start at L1); data-quality dashboard; feedback to custodians; pick MVP sources by readiness | Inventory shows < 2 seasons of history or no export | WSU engineering |
| R3 | Low adoption: officers see RADAR as extra work | M | H | Remove re-typing; champions; SOP update; SUS and time-on-task tracked; fast support | Falling log-ins; back-entered decisions rising | CGP + KNPHI |
| R4 | Unsafe AI recommendation contributes to a missed or delayed escalation | L | H | Rules set the level; validator; human confirmation; FN ceiling; kill switch; incident review | Override reasons citing wrong level | UM/CGHE + KNPHI |
| R5 | Security incident or data breach | L | H | Zones, MFA, encryption, audit, pen test, minimum-necessary data, incident runbook | Failed-login spikes; unpatched critical CVEs | WSU + KNPHI ICT |
| R6 | Server/GPU procurement or import delays | M | H | Order in month 1–2; develop on cloud with synthetic data meanwhile; consider Government hosting as interim | No PO by month 2 | WSU finance |
| R7 | Recruitment delays (coordinator, analyst, enterprise partner) | M | M | Early recruitment Proposal; interim cover from partners | Posts unfilled at month 2 | WSU |
| R8 | Power and connectivity failures at county EOCs | H | M | Starlink, UPS, light UI, SMS alerts, offline forms, paper fallback | Readiness assessment scores | CGP + counties |
| R9 | EOC staff turnover erodes skills | H | M | ToT, job aids, six-monthly refreshers, onboarding pack, in-app guidance | Share of active users trained < 80% | CGP |
| R10 | No recurrent budget after October 2029 | M | H | Cost model from Gate 2 data; engage KNPHI finance early; open-source stack; align with national budget calendar | No budget line in KNPHI submission by mid-2029 | PI + KNPHI |
| R11 | Regulatory change or DHA certification delays | M | M | Early DHA engagement; FHIR validation in CI; track regulations | New DHA requirements issued | WSU + DHA liaison |
| R12 | Enterprise software partner selected late or under-scoped | M | M | Select in months 1–2 with clear statement of work tied to Gate 1 and 2 deliverables | No contract by month 3 | WSU |
| R13 | A major outbreak diverts EOC staff from the project | M | M | Rapid-response mode: use the outbreak as live validation where safe; keep a minimal core team on delivery | Level 3 activation | Steering committee |
| R14 | Model performance drifts on real data | M | M | Monitoring, retraining procedure, disaggregated reporting | Rising override rate | UM/CGHE |
| R15 | Scope creep toward “integrate everything” | M | M | MVP scope locked; new sources only via the prioritisation criteria; change control in TWG | Unplanned connectors in sprint plans | PI + TWG |
3How risks are managed
- Review rhythm. Top risks at every TWG; full register at every steering committee and in each gate evidence pack.
- Escalation. Any risk rated High/High, or any early-warning sign that fires, goes to the steering committee within two weeks.
- Issues vs. risks. When a risk happens it becomes an issue with an action plan and date; the register records the outcome.
- Gate link. If a risk threatens the MVP deadline, the 30-day remediation notice to the foundation applies (doc 13).
4Key assumptions
If any of these turns out false, revisit the plan.
- KNPHI can nominate a system owner, data stewards and ICT staff from the start.
- At least four MVP sources can share data at Level 1–2 by March 2027.
- KNPHI/DHA will authorise a production hosting location by mid-2027.
- The DMT-PHE trigger-card set is stable enough to encode for the MVP.
- Sobek can provide a GHEC-AI interface for joint specification in the MVP phase.
Sources
- INV-110654 proposal — Budget (spending risks and mitigations), Data Access.
- Stage-gate paper — MVP remediation rule.
- Risk ratings are an initial assessment for the steering committee to confirm.