Infrastructure, Hosting & Security
Where RADAR runs, how it is protected, how it recovers from failure, and the controls that must pass before production.
In short
- Production runs on KNPHI/DHA-approved or other Government-authorised infrastructure; the budgeted Dell PowerEdge R770 is the project's main server; development uses non-identifiable data only.
- The network is split into zones with a few allowed paths; the AI zone has no internet egress.
- Controls follow the proposal's list — RBAC, least privilege, MFA, encryption, audit logging, backup/recovery and incident response — mapped to recognised standards.
- Before production: load, penetration and interface testing with reports shared with the foundation (Gate 2).
Why it matters
RADAR concentrates sensitive signals from many institutions and sits in the escalation path for emergencies. A breach would damage trust in every connected system; an outage during an outbreak would push EOCs back to paper exactly when speed matters. Security and resilience are therefore gate criteria, not afterthoughts.
How this document connects
1Hosting model
| Tier | Where | Data allowed |
|---|---|---|
| Development | Approved cloud or WSU-hosted (hosting subscription budgeted) | Synthetic and approved non-identifiable data |
| Staging / UAT | KNPHI/DHA-approved infrastructure | De-identified replays of real feeds |
| Production | KNPHI/DHA-approved on-premise or Government-authorised infrastructure Proposal | Live data, including restricted classes where unavoidable |
| Recovery | Second Government-authorised site Recommended | Encrypted backups; warm standby if funded |
Administration and data-residency requirements are defined by KNPHI/DHA. Proposal See doc 04 for server sizing and the GPU question.
2Network zones
3Security controls
Each control the proposal commits to, with how RADAR implements it and the reference standard to test against. Recommended
| Control Proposal | Implementation | Reference |
|---|---|---|
| Role-based permissions & least privilege | Keycloak roles mapped to geography and function (doc 10); admin access just-in-time; quarterly access reviews | ISO/IEC 27001 Annex A (access control) |
| Multifactor authentication | Mandatory for every user; phishing-resistant factors for administrators | NIST SP 800-63B |
| Encryption | TLS 1.2+ (1.3 preferred) in transit; mutual TLS between systems; encrypted disks/self-encrypting drives; encrypted backups; keys outside the data host | ISO/IEC 27001; OWASP ASVS |
| Audit logging | Append-only, hash-chained audit log for decisions and data access; OpenHIM transaction log; logs shipped off-host | IHE ATNA |
| Backup & recovery | Continuous database archiving + nightly full backups; off-site encrypted copies; quarterly restore tests | See targets below |
| Incident response | Runbook, contact tree, severity levels, breach-notification duties (DHA 48 h, ODPC 72 h) | Data Protection Act; Digital Health Act |
| Secure development | Threat modelling, code review, dependency and image scanning, SBOM, signed images, secrets in a vault | OWASP ASVS; OWASP SAMM |
| AI-specific threats | Prompt-injection defences, output validation, no agent write access without approval, model supply-chain checks | OWASP Top 10 for LLM Applications 2025 (doc 12) |
| Hardened platform | CIS benchmarks for OS and Kubernetes; R770 secure boot, TPM 2.0, silicon root of trust, system lockdown | CIS Benchmarks |
4Backup, recovery and availability targets
Starting targets to agree with KNPHI Recommended:
| Component | Recovery point objective | Recovery time objective |
|---|---|---|
| MER / FHIR database and audit log | ≤ 15 minutes | ≤ 4 hours |
| Raw landing store | ≤ 24 hours (sources can be re-pulled) | ≤ 24 hours |
| Analytics and signal store | Recomputable | ≤ 8 hours |
| LLM service | Stateless (model files backed up) | ≤ 8 hours; rules-only mode meanwhile |
- Availability: aim for 99.5% monthly for the DMT-PHE workspace, with planned maintenance outside working hours and frozen during active Level 2–3 events.
- Degraded modes: if the LLM is down, the workspace still shows rules levels and evidence; if RADAR is down, EOCs use paper DMT-PHE tools and back-enter.
- Power and connectivity: UPS on all EOC equipment; Starlink connectivity budgeted for KNPHI and sites. Proposal
5Pre-production checklist (Gate 2)
The stage gates require product hardening with test reports available to the foundation: scalability and load testing, cybersecurity and penetration testing, interface validation, and deployment within KNPHI/DHA-approved infrastructure. Proposal
- Load test at 10× normal volume (simulated national outbreak week) with workspace response times measured.
- Penetration test by an independent party covering web app, APIs, gateway and MCP tools; findings fixed and re-tested.
- Interface validation for every connector and the GHEC-AI hand-off, with signed test records.
- Restore test from off-site backup into a clean environment, timed against RTO.
- Access review confirming every account, role and break-glass path.
- Runbooks for operations, incidents and upgrades handed to KNPHI ICT.
6Operations
- Monitoring: pipeline freshness per source, error rates, queue depth, GPU/CPU/disk, certificate expiry, failed logins — alerts to an on-call rota.
- Patching: monthly for OS and dependencies; emergency patches within 72 hours for critical vulnerabilities.
- Change management: all changes via CI/CD; production changes approved by the KNPHI system owner.
- Transition: by Gate 3 the system runs on Government infrastructure with administrative rights transferred and maintenance, support and security procedures handed over. Proposal
7Open questions
- Where is the recovery site, and is a warm standby affordable? Owner: KNPHI + DHA
- Who operates production day to day before transition — WSU engineers with KNPHI shadowing, or KNPHI ICT from the start? Owner: Steering committee
- Which independent firm performs the penetration test, and does DHA certification require a specific one? Owner: WSU + DHA
Sources
- INV-110654 proposal — Data Access (security controls, hosting); Budget (server, hosting, Starlink).
- Stage-gate paper — Gate 2 milestone 2; Gate 3 milestone 2.
- Dell Technologies — PowerEdge R770 specification sheet (security features).