Washington State University · Global Health – KenyaRADAR Documentation
INV-110654 · Draft v0.1 · 29 October 2026
Doc 08·Operations

Signal-to-Response Workflow & 7-1-7

Who does what, in what order, from the first signal to an authorised response — including the 7-1-7 clock and the GHEC-AI hand-off.

For: EOC & surveillanceEngineeringM&E / researchStatus: Draft v0.1Updated: 29 October 2026

In short

  • Nine steps take an event from first signal to authorised response and closure.
  • RADAR does the assembling, scoring and time-stamping; people make every decision.
  • Level 1 events can be authorised by the county; Level 2–3 go through KNPHI PHEOC before the GHEC-AI hand-off.
  • Each step writes a timestamp to the MER, so 7-1-7 performance is measured continuously instead of reconstructed after the fact.

Why it matters

This is the workflow EOC staff will be trained on and evaluated against. It is also where the time is lost today — in hand-overs between people and systems. Writing it down step by step makes clear who owns each hand-over, what RADAR automates, and what is measured at each point.

How this document connects

Labels used in this document: Proposal stated in the funded proposal, stage-gate paper or deck · Research external evidence (see Sources) · Recommended proposed design choice, to be confirmed · Open decision still needed

1The workflow at a glance

COMMUNITY & FACILITY SUB-COUNTY SURVEILLANCE RADAR (SYSTEM) COUNTY EOC KNPHI PHEOC RESPONSE · GHEC-AI Signal reported m-Dharura · facility 1 MER opened detection stamped 2 Verify ≤ 24 h call · visit · discard 3 Link and score DMT-PHE draft ready 4 Confirm level confirm or override 5 L2–3: national confirm · activate 6 Match team GHEC-AI registry 7 Early actions 7 actions dated 8 7-1-7 computed close on criteria 9 L2–3 L1: county authorises
Who does what, in order. Columns are actors; time runs downward. RADAR (crimson) does the assembling and timestamping; people make every decision. Level 1 events can be authorised at county level (dashed path); Level 2–3 events pass through KNPHI PHEOC before the GHEC-AI hand-off.

2Step by step

#StepWhoWhat RADAR doesMER timestampTarget
1Signal reportedCHP, health worker, vet officer, ranger, labIngests from m-Dharura, KABS, KHIS2, LIMS, EIOSsource time—
2MER opened or matchedRADARLinks to an existing event or opens a new MERdetected_atMinutes after arrival
3VerifySub-county surveillance officerShows the signal and related records; records outcomeverified_at≤ 24 h Recommended
4Link, score, draftRADARFusion, risk score, signal card; rules level; agent draft with citationsscore timeMinutes
5Confirm levelCounty EOC (named officer)Confirm / modify / override with reasonclassified_atMedian ≤ 48 h from signal Proposal
6National confirmation (L2–3)KNPHI PHEOC incident managerSame workspace, national view; IHR notification if requiredescalated_at, notified_atNotification ≤ 1 day from detection
7Match respondersGHEC-AI with EOC approvalSends minimum-necessary hand-off; receives proposed teamresponse_authorised_atWithin level timelines (e.g. RRT ≤ 72 h)
8Early response actionsRRTs, county teamsTracks the seven actions with due timesaction_completed_at[1..7]All within 7 days of notification
9Monitor and closeCounty EOC / KNPHIWatch-period timer; computes 7-1-7 intervalsclosed_atPer trigger-card exit criteria

37-1-7 in practice

7-1-7 sets three timeliness targets: detect within 7 days of emergence, notify within 1 day, and complete early response actions within 7 days. Research The seven early response actions are:

  1. Initiate investigation or deploy an investigation/response team
  2. Conduct epidemiological analysis of burden, severity and risk factors, and an initial risk assessment
  3. Obtain laboratory confirmation of the outbreak aetiology
  4. Initiate appropriate case management and infection prevention and control measures in health facilities
  5. Initiate appropriate public-health countermeasures in affected communities
  6. Initiate appropriate risk communication and community engagement
  7. Establish a coordination mechanism

An action that does not apply is recorded as “N/A”, not left blank. For larger events, 7-1-7 is best applied in real time through an Early Action Review shortly after notification, feeding later intra- and after-action reviews. RADAR's event timeline is designed to be the working record for those reviews.

Why this changes things

Today 7-1-7 performance in Kenya is assessed retrospectively and case by case, because the timestamps that define it sit in different systems. Proposal With the MER, the same numbers are available live for every event — and the slowest step is visible while there is still time to act.

4Who is notified, and when

TriggerNotifiedChannel
New high-band signal cardCounty surveillance coordinator; sub-county officerWorkspace + SMS
Signal not reviewed within agreed timeCounty EOC managerSMS + email
Level 1 confirmedCounty EOC team; KNPHI PHEOC (for information)Workspace
Level 2–3 recommendedKNPHI PHEOC incident managerWorkspace + SMS + phone tree
Response authorisedGHEC-AI; RRT leads; county director of healthAPI + SMS
7-1-7 action overdueAction owner and EOC managerWorkspace + SMS

Starting proposal Recommended; confirm against DMT-PHE “responsible actors” per trigger card.

5The GHEC-AI hand-off

EOC officer DMT-PHE agent MER GHEC-AI Responders 1 approve Level 2 + mobilisation 2 log decision · timestamp 3 hand-off: minimum necessary fields 4 match team to needs 5 proposed team 6 approve deployment 7 mobilise 8 status + response timestamps
The GHEC-AI hand-off, step by step. Only after a named officer authorises escalation does RADAR send GHEC-AI the minimum necessary operational fields (event ID, hazard, location, level, capacities needed) — no patient identifiers. Deployment status flows back so the response timestamps land on the same MER event.

RADAR provides upstream intelligence, the DMT-PHE agent supports human-supervised classification and escalation, and GHEC-AI matches approved response needs to available workforce and capacity — RRT registry, training and skills matching, deployment readiness and mobilisation. Proposal The payload is defined in doc 05. Evaluating this hand-off (reliability, completeness and timeliness of information exchange, user experience, effect on mobilisation) is one of the four learning questions (doc 14).

6Worked example: suspected RVF in northern Kenya

Based on the scenario in the project deck; times are illustrative. Proposal

  1. Week 0 — rainfall anomaly. KMD data shows heavy rainfall; RADAR's RVF forecast prior rises for several northern sub-counties. No alert, but sensitivity increases.
  2. Week 4, Mon 09:00 — animal signal. KABS reports a cluster of livestock abortions. RADAR opens MER RVF-…-001 (detected_at); the score moves to “watch”.
  3. Mon 15:00 — human signal. m-Dharura reports two febrile patients with bleeding in the same sub-county. Linker attaches both to the MER; fusion moves the score to “alert”; signal card issued to the county.
  4. Tue 10:00 — verification. Sub-county officer confirms by phone and visit (verified_at).
  5. Tue 11:00 — classification. RVF trigger card rules return Level 2; agent drafts a recommendation (One Health investigation, joint human–animal response, samples to KEMRI/NPHL) with citations. County EOC manager confirms (classified_at, 26 h after detection).
  6. Tue 14:00 — national. KNPHI PHEOC confirms Level 2, activates support (escalated_at, notified_at).
  7. Tue 16:00 — hand-off. GHEC-AI proposes a joint human–animal RRT; EOC approves; teams mobilise (response_authorised_at).
  8. Days 2–7 — actions. Investigation, lab confirmation, IPC, community countermeasures, RCCE, vector control and coordination tracked to completion; 7-1-7 computed automatically.

7When things go wrong

SituationWhat happens
RADAR or connectivity downSwitch to paper DMT-PHE tools; record decisions with real times; back-enter when restored (flagged as back-entered)
Officer disagrees with the recommendationOverride with reason — this is expected and valuable; overrides feed model review
Validator blocks the AI draftRules level and evidence shown without the draft; senior review (doc 07)
Event spans several countiesOne MER with all affected units; KNPHI PHEOC coordinates
Cross-border riskLevel 3 path; notification to WHO through the IHR National Focal Point
Signal turns out to be a duplicateData steward merges MERs; history preserved

8What changes for EOC staff

TodayWith RADAR
Phone calls and re-typing to piece an event togetherOne event page with linked records from every source
Escalation by discussion and experienceTrigger-card rules + cited recommendation; officer decides
Decisions in spreadsheets and paper logsTime-stamped, attributable decision log
7-1-7 reconstructed after the eventLive 7-1-7 clock per event
Separate request for respondersPre-filled GHEC-AI request from the trigger card's support package

9Open questions

  1. Verification time target. Is ≤ 24 h right for all signal types? Owner: KNPHI · MVP
  2. Who records 7-1-7 action completion — RRT leads in RADAR, or EOC staff on their behalf? Owner: KNPHI + CGP
  3. Does an L1 county authorisation also go to GHEC-AI, or only L2–3? Owner: KNPHI + Sobek

Sources

  • INV-110654 proposal — “How RADAR will fit in the surveillance and response landscape”; Measurement and Evaluation (learning question 4).
  • RADAR deck — slide 12 (RVF scenario, RADAR–DMT-PHE–GHEC-AI complementarity); slide 8 (Ebola trigger card).
  • Stage-gate paper — Gate 2 threshold “median time from signal detection to structured DMT-PHE risk classification ≤ 48 hours”.
  • 7-1-7 Alliance — FAQ: definitions, early response actions, Early Action Reviews.