Signal-to-Response Workflow & 7-1-7
Who does what, in what order, from the first signal to an authorised response — including the 7-1-7 clock and the GHEC-AI hand-off.
In short
- Nine steps take an event from first signal to authorised response and closure.
- RADAR does the assembling, scoring and time-stamping; people make every decision.
- Level 1 events can be authorised by the county; Level 2–3 go through KNPHI PHEOC before the GHEC-AI hand-off.
- Each step writes a timestamp to the MER, so 7-1-7 performance is measured continuously instead of reconstructed after the fact.
Why it matters
This is the workflow EOC staff will be trained on and evaluated against. It is also where the time is lost today — in hand-overs between people and systems. Writing it down step by step makes clear who owns each hand-over, what RADAR automates, and what is measured at each point.
How this document connects
1The workflow at a glance
2Step by step
| # | Step | Who | What RADAR does | MER timestamp | Target |
|---|---|---|---|---|---|
| 1 | Signal reported | CHP, health worker, vet officer, ranger, lab | Ingests from m-Dharura, KABS, KHIS2, LIMS, EIOS | source time | — |
| 2 | MER opened or matched | RADAR | Links to an existing event or opens a new MER | detected_at | Minutes after arrival |
| 3 | Verify | Sub-county surveillance officer | Shows the signal and related records; records outcome | verified_at | ≤ 24 h Recommended |
| 4 | Link, score, draft | RADAR | Fusion, risk score, signal card; rules level; agent draft with citations | score time | Minutes |
| 5 | Confirm level | County EOC (named officer) | Confirm / modify / override with reason | classified_at | Median ≤ 48 h from signal Proposal |
| 6 | National confirmation (L2–3) | KNPHI PHEOC incident manager | Same workspace, national view; IHR notification if required | escalated_at, notified_at | Notification ≤ 1 day from detection |
| 7 | Match responders | GHEC-AI with EOC approval | Sends minimum-necessary hand-off; receives proposed team | response_authorised_at | Within level timelines (e.g. RRT ≤ 72 h) |
| 8 | Early response actions | RRTs, county teams | Tracks the seven actions with due times | action_completed_at[1..7] | All within 7 days of notification |
| 9 | Monitor and close | County EOC / KNPHI | Watch-period timer; computes 7-1-7 intervals | closed_at | Per trigger-card exit criteria |
37-1-7 in practice
7-1-7 sets three timeliness targets: detect within 7 days of emergence, notify within 1 day, and complete early response actions within 7 days. Research The seven early response actions are:
- Initiate investigation or deploy an investigation/response team
- Conduct epidemiological analysis of burden, severity and risk factors, and an initial risk assessment
- Obtain laboratory confirmation of the outbreak aetiology
- Initiate appropriate case management and infection prevention and control measures in health facilities
- Initiate appropriate public-health countermeasures in affected communities
- Initiate appropriate risk communication and community engagement
- Establish a coordination mechanism
An action that does not apply is recorded as “N/A”, not left blank. For larger events, 7-1-7 is best applied in real time through an Early Action Review shortly after notification, feeding later intra- and after-action reviews. RADAR's event timeline is designed to be the working record for those reviews.
Today 7-1-7 performance in Kenya is assessed retrospectively and case by case, because the timestamps that define it sit in different systems. Proposal With the MER, the same numbers are available live for every event — and the slowest step is visible while there is still time to act.
4Who is notified, and when
| Trigger | Notified | Channel |
|---|---|---|
| New high-band signal card | County surveillance coordinator; sub-county officer | Workspace + SMS |
| Signal not reviewed within agreed time | County EOC manager | SMS + email |
| Level 1 confirmed | County EOC team; KNPHI PHEOC (for information) | Workspace |
| Level 2–3 recommended | KNPHI PHEOC incident manager | Workspace + SMS + phone tree |
| Response authorised | GHEC-AI; RRT leads; county director of health | API + SMS |
| 7-1-7 action overdue | Action owner and EOC manager | Workspace + SMS |
Starting proposal Recommended; confirm against DMT-PHE “responsible actors” per trigger card.
5The GHEC-AI hand-off
RADAR provides upstream intelligence, the DMT-PHE agent supports human-supervised classification and escalation, and GHEC-AI matches approved response needs to available workforce and capacity — RRT registry, training and skills matching, deployment readiness and mobilisation. Proposal The payload is defined in doc 05. Evaluating this hand-off (reliability, completeness and timeliness of information exchange, user experience, effect on mobilisation) is one of the four learning questions (doc 14).
6Worked example: suspected RVF in northern Kenya
Based on the scenario in the project deck; times are illustrative. Proposal
- Week 0 — rainfall anomaly. KMD data shows heavy rainfall; RADAR's RVF forecast prior rises for several northern sub-counties. No alert, but sensitivity increases.
- Week 4, Mon 09:00 — animal signal. KABS reports a cluster of livestock abortions. RADAR opens MER
RVF-…-001(detected_at); the score moves to “watch”. - Mon 15:00 — human signal. m-Dharura reports two febrile patients with bleeding in the same sub-county. Linker attaches both to the MER; fusion moves the score to “alert”; signal card issued to the county.
- Tue 10:00 — verification. Sub-county officer confirms by phone and visit (
verified_at). - Tue 11:00 — classification. RVF trigger card rules return Level 2; agent drafts a recommendation (One Health investigation, joint human–animal response, samples to KEMRI/NPHL) with citations. County EOC manager confirms (
classified_at, 26 h after detection). - Tue 14:00 — national. KNPHI PHEOC confirms Level 2, activates support (
escalated_at,notified_at). - Tue 16:00 — hand-off. GHEC-AI proposes a joint human–animal RRT; EOC approves; teams mobilise (
response_authorised_at). - Days 2–7 — actions. Investigation, lab confirmation, IPC, community countermeasures, RCCE, vector control and coordination tracked to completion; 7-1-7 computed automatically.
7When things go wrong
| Situation | What happens |
|---|---|
| RADAR or connectivity down | Switch to paper DMT-PHE tools; record decisions with real times; back-enter when restored (flagged as back-entered) |
| Officer disagrees with the recommendation | Override with reason — this is expected and valuable; overrides feed model review |
| Validator blocks the AI draft | Rules level and evidence shown without the draft; senior review (doc 07) |
| Event spans several counties | One MER with all affected units; KNPHI PHEOC coordinates |
| Cross-border risk | Level 3 path; notification to WHO through the IHR National Focal Point |
| Signal turns out to be a duplicate | Data steward merges MERs; history preserved |
8What changes for EOC staff
| Today | With RADAR |
|---|---|
| Phone calls and re-typing to piece an event together | One event page with linked records from every source |
| Escalation by discussion and experience | Trigger-card rules + cited recommendation; officer decides |
| Decisions in spreadsheets and paper logs | Time-stamped, attributable decision log |
| 7-1-7 reconstructed after the event | Live 7-1-7 clock per event |
| Separate request for responders | Pre-filled GHEC-AI request from the trigger card's support package |
9Open questions
- Verification time target. Is ≤ 24 h right for all signal types? Owner: KNPHI · MVP
- Who records 7-1-7 action completion — RRT leads in RADAR, or EOC staff on their behalf? Owner: KNPHI + CGP
- Does an L1 county authorisation also go to GHEC-AI, or only L2–3? Owner: KNPHI + Sobek
Sources
- INV-110654 proposal — “How RADAR will fit in the surveillance and response landscape”; Measurement and Evaluation (learning question 4).
- RADAR deck — slide 12 (RVF scenario, RADAR–DMT-PHE–GHEC-AI complementarity); slide 8 (Ebola trigger card).
- Stage-gate paper — Gate 2 threshold “median time from signal detection to structured DMT-PHE risk classification ≤ 48 hours”.
- 7-1-7 Alliance — FAQ: definitions, early response actions, Early Action Reviews.