Deployment, Training & Adoption
How each EOC goes live: readiness assessment, ICT setup, training, the eight-week parallel run, go-live and ongoing support.
In short
- RADAR rolls out to the national EOC first (Gate 1), then to five priority county EOCs (Gate 2).
- Every site follows the same seven steps: readiness, ICT & access, training, an eight-week parallel run, go/no-go, live use, support.
- The parallel run produces the concordance dataset by comparing RADAR and usual practice against a blinded expert panel.
- Adoption is designed in: champions, less (not more) work for officers, fast support, and refreshers to counter staff turnover.
Why it matters
A technically excellent RADAR that county officers do not use fails every gate: SUS, documentation completeness and 7-1-7 all depend on real use. The JEE scored activation and coordination of personnel at the lowest level; uneven county readiness after devolution and frequent staff rotation are named gaps. Proposal Deployment and adoption need as much design as the software.
How this document connects
1Rollout sequence
| Wave | Sites | Timing | Gate |
|---|---|---|---|
| 0 · MVP demonstration | KNPHI PHEOC (test environment) | By June 2027 | Gate 1 (MVP acceptance) |
| 1 · National | KNPHI PHEOC — 8-week parallel run | Mid-2027 | Gate 1 |
| 2 · Counties | Five priority county EOCs Proposal | Oct 2027 – Sep 2028 | Gate 2 |
| 3 · Sustain | All sites under KNPHI operation | Oct 2028 – Sep 2029 (grant ends 31 Oct 2029) | Gate 3 |
Choosing the five counties
Selection criteria to agree with KNPHI Recommended:
- Outbreak burden across the four categories (e.g. cholera, RVF, VHF risk).
- One Health relevance — pastoral and wildlife interfaces where animal signals matter.
- Cross-border exposure — points of entry, neighbouring outbreaks.
- Readiness — functioning county EOC, KABS and EBS coverage, connectivity, leadership commitment.
- Overlap with DMT-PHE pilots — CGP reports that DMT-PHE pilot testing was planned in ten high-risk counties. Research
- Diversity — include at least one county with weaker infrastructure so the design is tested where it is hardest.
2Seven steps per site
Site readiness checklist
| Area | Check |
|---|---|
| People | Named EOC manager and site champion; surveillance officers identified for training; supervisor for review timers |
| Workflow | Current escalation path documented; DMT-PHE paper tools in use; baseline 7-1-7 and detection-to-classification measured |
| Power | Grid reliability; UPS or solar backup for EOC devices and network |
| Connectivity | Measured bandwidth and uptime; Starlink installed where needed; fallback mobile data |
| Devices | Laptops/monitors per role (ICT supplies budgeted per period); browser versions; security baseline |
| Access | User accounts with MFA; roles assigned; data-sharing agreements cover the county's sources |
| Support | Helpdesk contact known; escalation path for incidents; paper fallback procedure printed |
3Training plan
| Audience | Learns | Format |
|---|---|---|
| EOC managers & incident managers | Signal cards, confirming levels, overrides, 7-1-7 dashboard, GHEC-AI approvals | Workshop + simulation exercise (SIMEX) |
| Surveillance officers | Verification, event pages, recording actions, back-entry | Hands-on sessions, job aids, mentorship |
| Data analysts & stewards | Quarantine queues, merges/splits, data-quality dashboard, analytics configuration | Technical training |
| ICT administrators | Accounts, backups, monitoring, patching, incident response | Runbooks + shadowing the engineering team |
| Trainers (ToT) | All of the above + facilitation | Training of trainers so KNPHI can train new staff after the grant |
- Competency assessment after training, with records kept — an Output 4 deliverable for Gate 2. Proposal
- Outbreak user guides for all four outbreak categories, plus algorithms and workflow materials — Output 5. Proposal
- Refreshers every six months and on-boarding packs for new staff, because rotation and infrequent events erode practice. Recommended
- Simulation drills using RADAR's synthetic outbreak replay, so staff practise before a real event.
4The eight-week parallel run
The proposal and stage gates require an eight-week parallel validation deployment of DMT-PHE at the national EOC, generating a concordance dataset against independent expert-panel review. Proposal Design points Recommended:
- Blinding. Panel members see the same facts but not the AI or usual-practice answer. For the first weeks, keep the AI recommendation hidden from decision-makers (shadow mode) so the comparison is clean; reveal it once the protocol allows.
- Enough cases. Real Level 2–3 events in eight weeks may be few. Pre-agree a minimum number of assessed events and top up with structured simulation cases and retrospective events so the concordance estimate is meaningful.
- Pre-registered analysis. Define concordance (exact level agreement, plus a chance-corrected statistic such as weighted kappa), timeliness and documentation completeness before the run starts (doc 14).
- Weekly discrepancy review. Every disagreement is reviewed by KNPHI and UM/CGHE; safety concerns stop the clock.
- County runs repeat this in Phase 2, with AI retraining on national operational data in between.
5Adoption by design
Less work, not more
RADAR must remove re-typing and phone reconstruction. Measure time-on-task; cut any step that adds burden.
Site champions
One trained champion per EOC, first line of support and feedback channel.
Closing the loop
Show officers what happened to their signals and how their overrides improved the system.
Official backing
Update KNPHI SOPs so RADAR is the recognised record, not an optional extra.
6Support model
| Tier | Who | Handles | Target response |
|---|---|---|---|
| L1 | Site champion + CGP helpdesk | How-to questions, accounts, password resets, simple data fixes | Same working day |
| L2 | KNPHI ICT / data stewards | Connector failures, data-quality issues, configuration | Next working day; 4 h during an active Level 2–3 event |
| L3 | WSU / UM engineering, enterprise partner | Bugs, outages, security incidents, model issues | 1 h for outages during an active event |
Targets are a starting proposal Recommended; formalise in a support agreement before the first county go-live.
7Open questions
- Which five counties, and in what order? Owner: KNPHI · before Gate 1
- Minimum number of assessed events for the national parallel run. Owner: MEL + KEMRI · protocol
- Is shadow mode acceptable to KNPHI for the first weeks? Owner: KNPHI
- Who funds county connectivity and devices after the grant? Feeds the recurrent budget (doc 16). Owner: KNPHI + counties
Sources
- INV-110654 proposal — Phase 1–2 descriptions; Budget (training materials, ICT, Starlink, participant reimbursements).
- Stage-gate paper — Gate 1 milestone 4 (parallel validation); Gate 2 milestones 1, 4, 5.
- RADAR deck — slide 7 (gaps: county readiness, workforce turnover); slide 14 (CGP role: rollout, training, helpdesk).
- CGP — DMT-PHE validation and planned pilots.