Start Here: RADAR Documentation Map
How the document set is organised, how the documents depend on each other, and which ones to read first for your role.
In short
- The RADAR project is broken into 18 focused documents, each covering one area, workflow or decision.
- They are grouped into five tracks: Orientation, Product & Architecture, Operations, Trust & Safety, Delivery, plus a glossary.
- Every document opens with a plain-language summary and a “How this document connects” panel showing what it depends on and what it feeds.
- Pick the reading path for your role below, or follow the map.
Why it matters
RADAR touches surveillance officers, engineers, lawyers, evaluators and funders. One long document would bury each group's questions inside everyone else's. Separate, linked documents let each reader go straight to what they own — while the links make sure no one designs a piece in isolation.
Grant start is 1 November 2026; these documents are the working baseline for kick-off.
1The document map
Read the map from top to bottom. The problem and landscape decide what the shared event record must hold; the build documents turn that record into a working system; operations put it into EOCs; trust-and-safety documents set limits on everything above; and the delivery documents turn the evidence into gate decisions.
2Documents by track
Orientation
What RADAR is, the problem it solves and the systems it works with.
01Project OverviewThe problem RADAR solves, what it is (and is not), its three working layers, the four outbreak categories and the outcomes it must prove.02Kenya's Surveillance Landscape & Data SourcesEvery system RADAR draws from — human, animal, environmental, laboratory and open-source — who owns it, what it holds and when RADAR connects to it.Product & Architecture
How RADAR is designed and built: data contract, architecture, integration, analytics and AI.
03Minimum Event Record (MER) SpecificationThe small shared record that gives one outbreak event one identity across systems — fields, lifecycle, timestamps, linking rules and FHIR mapping.04System Architecture & Technology StackThe five layers of RADAR, the components inside them, how data moves between them, and the recommended open-source technology stack.05Interoperability & IntegrationStandards (FHIR R4, Kenya Core, MCP, OpenHIE), connector patterns per source system, the ingestion pipeline and an integration maturity ladder.06Intelligence Layer: Data Fusion & Early WarningHow RADAR turns harmonised feeds into early-warning signals: record linkage, anomaly detection, cross-stream fusion, forecasting and risk scoring.07DMT-PHE Decision Support & AI AgentThe digitised Decision-Making Tool for Public Health Emergencies and its AI agent: rules, retrieval, citations, human confirmation and the audit trail.Operations
How RADAR is used day to day in EOCs and how it reaches each site.
08Signal-to-Response Workflow & 7-1-7Who does what, in what order, from the first signal to an authorised response — including the 7-1-7 clock and the GHEC-AI hand-off.09Deployment, Training & AdoptionHow each EOC goes live: readiness assessment, ICT setup, training, the eight-week parallel run, go-live and ongoing support.Trust & Safety
The legal, security and AI-assurance guardrails that make RADAR safe to use.
10Data Governance, Privacy & EthicsThe laws, approvals and agreements RADAR needs, how data is classified, where each class may live and how access is controlled.11Infrastructure, Hosting & SecurityWhere RADAR runs, how it is protected, how it recovers from failure, and the controls that must pass before production.12Responsible AI & Model AssuranceHow the AI layer is evaluated, constrained, monitored and retrained so that it stays accurate, explainable and safe.Delivery & Management
Timeline, gates, evidence, partners, money and risk.
13Roadmap & Stage GatesThe three-year plan from MVP to KNPHI transition, the three funding gates, their milestones and the thresholds that must be met.14Monitoring, Evaluation & LearningLearning questions, exact metric definitions, where each number comes from, and the baseline-to-endline evaluation design.15Partners, Roles & Project GovernanceWho the partners are, who owns which workstream, the RACI for key decisions and the meeting rhythm that keeps the project on track.16Budget & ResourcesThe US$1.5M budget by category and period, the team's level of effort and the cost questions to settle early.17Risk RegisterThe main delivery, technical, data, AI and sustainability risks, how likely and serious each is, and how each will be reduced.Reference
Shared vocabulary and source list.
18Glossary & ReferencesEvery acronym and term used in the set, plus the source documents and external references.3Reading paths by role
You do not need to read everything. Start with the path for your role; the numbered boxes link straight to each document, in order.
Leadership & funder
The why, the plan, the money and the risks.
Project Overview → Roadmap & Stage Gates → Partners & Governance → Budget & Resources → Risk Register
Engineering team
Build order: data contract first, then architecture and integration.
Surveillance Landscape → Minimum Event Record → System Architecture → Interoperability → Intelligence Layer → DMT-PHE & AI Agent → Security & Infrastructure → Responsible AI
EOC & surveillance officers
What changes in your daily work and how you are supported.
Project Overview → Signal-to-Response Workflow → DMT-PHE & AI Agent → Deployment & Adoption
M&E and researchers
What is measured, how, and what each gate needs.
MEL Framework → Minimum Event Record → Responsible AI → Roadmap & Stage Gates
4How the documents depend on each other
Each document lists the documents it builds on and the ones it informs. When you change one, check the “Informs” column: those documents may need updating too.
5How to read and maintain these documents
Labels you will see
| Label | Meaning | How to treat it |
|---|---|---|
| Proposal | Stated in the funded proposal (INV-110654), the stage-gate paper or the project deck. | Committed scope. Change only through the consortium and foundation. |
| Research | External evidence — laws, standards, published studies, vendor specifications. | Check the cited source for the latest version before relying on it. |
| Recommended | A design choice proposed in these documents. | A starting point for the technical working group to confirm or replace. |
| Open | A decision that has not yet been made. | Needs an owner and a date. Each document ends with its open questions. |
Keeping the set healthy
- One owner per document. Suggested owners are listed in 15 · Partners & Governance.
- Change the source, then the dependants. If the MER fields change (doc 03), revisit 04, 05, 06, 08 and 14.
- Version and date every change. The header of each document shows its status and last update.
- Close open questions in writing. When a Open item is decided, record the decision, the date and who made it, and change the label.
While breaking the project down, a few differences between the proposal, the stage-gate paper and the deck came to light — for example five vs. four county EOCs in Phase 2, a 0.85 vs. 0.88 concordance threshold at Gate 2, and budget line items that add up to more than the total. Each is flagged where it matters (mainly in documents 13 and 16) and should be settled at kick-off.
6Source documents
Everything here is derived from the three source documents in the project's _docs folder, plus external research cited in each document.